Procedure for Maintenance of Sieves

1.0 OBJECTIVE
To lay down a procedure for maintenance of sieves.
2.0 SCOPE
Module - 1,2,3,4 and 5.
3.0 RESPONSIBILITY
Production officer.
4.0 ACCOUNTABILITY
Production executive.
5.0 PROCEDURE
5.1 Check the integrity and code number after receiving the approved new sieve.
5.2 Enter the relevant details in the sieves inventory record.
5.3 Clean the new sieve initially with lint free duster followed by water and finally dry with compressed air.
5.4 Keep the cleaned sieves covered with polybags in sieve stand or pallet in washed equipment hold area.
5.5 Check the integrity before and after operation.
5.6 Inform production officer, if sieve got damaged during operation.
5.7 Replace the damaged sieve with new sieve after making entries in the sieve maintenance / Inventory record.
5.8 Send the damaged sieve to maintenance department for destruction and disposal along with the scrap disposal form. Record in the sieve inventory record.
5.9 Clean the sieve after operation cover with polybags and keep in the sieve stand / pallet.