1.0 Purpose: The purpose of this document is to qualify new facility, in order to establish documented evidence that the facility has been designed and installed as per the approved design specifications, made operational, perform as intended and meets the requirements of national and international requirements/ guidelines for c GMP`s, safety and environment. 2.0 Reason for Establishing protocol for qualification of the facility: Facility has been designed and constructed to facilitate manufacturing and packing of tablets, hard gelatin capsule and dry syrups formulations at Bommasandra Industrial area. Hence qualification of the facility is planned. 3.0 PROTOCOL APPROVAL SIGNATURES 4.0 Scope: This protocol is applicable for qualification of the facility of Micro labs limited, Bommasandra, 5.0 Validation team and responsibilities: Engineering Department: Execution, compilation and review of data Quality Assurance : Preparation, review and approval of the protocol Production : Checks and Review Quality control : Execution of the protocol.
6.0 Design Qualification (DQ): 6.1 Purpose: The Purpose of design qualification is to ensure that all the critical aspects of cGMP’s, Product/Process requirements, safety, environment, ergonomics, statutory requirements and environment controls have been considered in designing the new facility and the same has been complied & documented 6.2 Facility Design in brief: Ground floor: Raw material store, Packing material store, tablet manufacturing area, capsule manufacturing area, dry syrup manufacturing area, primary packing cubicle, bulk storage area, secondary packing area, Finished goods store, washrooms, change rooms (Primary and secondary), cleaned equipment storage area, Dispensing area, purified water plant. First floor : Quality control laboratory, Quality assurance Service floor: Air handling systems/ utilities 7.0 Critical Attributes to be met while designing the facility: 7.1 Layout and Design must aim to minimize the risk of errors and permit effective cleaning and maintenance in order to avoid cross contamination, build up of dust or dirt and in general any adverse effect on the quality of products. 7.2 Location and surroundings: All Measures to be considered in order to avoid risk of contamination from external environment which includes open sewage, drain, public lavatory or any factory which produces disagreeable or obnoxious odor, fumes, excessive soot, dust, smoke or chemical emissions. 7.3 Premises: Premises shall be designed & equipped so as to afford maximum protection against the entry of rodents, crawling insects, flying insects, lizards, flies, birds & other animals. 7.3.1 The premises shall be provided with adequate working space to allow orderly & logical placement of equipments. 7.4 Floor: 7.7 Paint: 7.10.5 The lighting units are scientifically apportioned so as to provide adequate light for the area in which they are used. 7.10.6 Light fixtures shall be accessible to allow proper maintenance, cleaning & to prevent accumulation of dust or foreign matter. 7.11 Safety aspects: 7.11.1 Emergency exits 7.11.2 Smoke detectors 7.11.3 Fire extinguishers. 7.11.4 Easy access to first aid kit. 7.11.5 Camera system. 7.11.6 Solvent storage complying the local statutory regulations. 7.11.7 Round the clock security for the premises 7.12 Regulatory Requirements (Necessary approvals shall be obtained from following government agencies) 7.12.1 Industrial development corporation, Karnataka. 7.12.2 State electricity board 7.12.3 State pollution control board 7.12.4 Factory inspectorate. 7.12.5 Food and drugs administration, Karnataka. 7.13.1 cGMP complied process equipments are provided to prevent cross contamination. 7.13.2 Automated material handling systems to minimize manual handling. 8.0 Design specification: (Room/Section wise): Design specifications in minute details shall be finalized for each room/section of the Facility .Design Requirements with respect to following points shall be finalized & enclosed to this protocol 8.1 Room Dimensions (L x B x H). 8.2 Area in Sq. feet. 8.3 Floor. 8.4 Coving. 8.5 Walls. 8.6 Doors. 8.7 Door closure. 8.8 Vision panels. 8.9 Ceiling/ False ceiling. 8.10 Paint. 8.11 Electrical fittings, lighting fixtures. 8.12 Drainage. 8.13 Utilities Points. 8.14 Air inlet/ Return grills 8.15 Machine 8.16 Temperature 8.17 Humidity 8.18 Pressure differential 8.19 HVAC 8.20 Water system 8.21 Area Qualification ( AQ): a) Pressure differential b) Non- Viable particle count c) Temperature mapping of raw material store d) Temperature monitoring. 8.21.1 Microbial monitoring: a) Settle plate count b) Volumetric air sampling for viable count. c) Swab test d) Rinse analysis e) Drainage swabs 9.0 Installation Qualification: 9.1 Purpose: Purpose of installation qualification is to establish documented evidence that the facility has been designed and constructed as intended and deviations, if any are justified & recorded. 9.2 Facility Layout (To Scale) Approved layout of each floor (Ground floor, First floor and Service floor) shall be matched with the actual floor construction. Any deviation to the approved layout shall be documented, Justified and approved by corporate technical team & project head. Impact of the same shall be assessed with respect to product quality. 9.2 Facility within and outside shall be assessed with respect to compliance of cGMP’s related to location, surroundings and premises. 9.3 Room data sheets: Refer design requirements of each room/ area/section. Verify the compliance & record. Any deviation shall be documented, discussed & approved incase it is concluded that the deviation shall have no impact directly or indirectly on the product quality. If otherwise, required actions shall be taken & documented. 9.4 Termite treatment certificate, FDA license to manufacture drug products in the new facility, approved layouts (Floor wise), certificates from various contractors (civil, electrical) and from various government agencies shall be attached to installation qualification report. 9.5 Changes made in the facility layouts since the start of construction of the facility shall be documented, giving justification for each change made in the layout or design specifications. 9.6 Acceptance Criteria: The facility shall meet approved design requirements and floor layouts. Any change in the approved design or layout shall be through change control and documented. Deviations if any shall be justified, assessed, approved and documented. 10.0 Operational qualification: Every room/ section on each floor shall be checked for flawless and smooth functioning of the following as applicable. Any discrepancy shall be identified, corrected and documented. 10.1 Opening of the doors. 10.2 Closing of the doors. 10.3 Door locks (Lock & Unlock) 10.4 Door handles & hinges 10.5 Door closure. 10.6 Light source & fixtures. 10.7 Electric points & their earthling. 10.8 Water points. 10.9 Compressed air use points. 10.10 Air Handling Unit. 10.11 Differential pressure. 10.12 Drain Points. 10.13 Acceptance Criteria: Intended out put of the above features shall be met for each room/section as applicable. 11.0 PERFORMANCE QUALIFICATION: Performance Qualification of various support services provided in each room are detailed in the respective utility protocols 12.0 Requalification criteria: 12.1 Any change/ modification is made in the facility design or layout. The affected area shall be requalified and the room data sheet of the affected area shall be updated to incorporate the change(s) made. 12.2 Any change made in the existing area support services or new or additional features are added to the room. 13.0 Discussions & Summary: Data collected during the execution of this protocol shall be compiled and evaluated and discussed. Summary report shall be prepared. 14.0 Conclusions and final approvals: From the data compiled, a summary report shall be prepared. Corporate technical team shall review and approve the final summary report prior to handling of the building for regular use. 15.0 Attachments: Approved drawings Door specifications Certificates |
This Blog is created for the updation of knowledge on current Good Manufacturing Practices (cGMP) and current Updates from all regulatory authorities. Also one can archive Standard Operating Procedures (SOPs) for any Pharma plant.
This provides a brief and clear understanding about the facility validation. Each sentences are written very precisely in a simple language.Like the most.
ReplyDeleteCan u mail the validation of Air Handling system.
ReplyDeletesyd.mbn@gmail.com