Transfer of Materials from Hold area to Packing Machine

1.0 OBJECTIVE To lay down a procedure for Transferring of Materials from Hold area to packing machine. 2.0 SCOPE Module - 1.2 and 3. 3.0 RESPONSIBILITY Concerned Hold room person. 4.0 ACCOUNTABILITY Production Officer 5.0 PROCEDURE 5.1 Transferring of Tablets / Pellets containers. 5.1.1 Before transferring the goods check the Batch Manufacturing Record(BMR) is completed in all respect. 5.1.2 As mentioned in BMR check the number of drums. Ex: If 10 / 10 is written check that all twenty containers are available. 5.1.3 Transfer the containers to a trolley 5.1.4 Ensure that respective primary packing room is free from previous batch / product. 5.1.5 Transfer the trolley to the air lock. 5.1.6 Transfer the individual containers to primary packing . 5.1.7 Ensure that all containers are transferred. 5.2 Transferring of primary packing materials. 5.2.1 Check the foils along with the packing work order. 5.2.2 Check the labels of all foils and counter sig...

Procedure for opening and closing of department

1.0 OBJECTIVE To lay down a procedure for opening and closing of department. 2.0 SCOPE Module -1,2,3,4,5, quarantine areas and packing areas. 3.0 RESPONSIBILITY Production Officer, Junior Technical Officer and Security supervisor 4.0 ACCOUNTABILITY Manager - Production. 5.0 PROCEDURE 5.1 List of authorized persons for opening and closing of departments should be given in Annexer 5.2 OPENING 5.2.1 Take the keys from security department after entries made in key register and open the department and keep the keys in respective place. 5.2.2 Switch ‘ON’ the lights ,ensure the availability of fresh dresses (as per schedule), gloves and disinfectant. 5.2.3 Check whole department for cleanliness, if required get it cleaned. 5.3.4 Go through the ‘Log book’. 5.3 CLOSING 5.3.1 Ensure all the service lines like compressed air, vacuum, purified water, potable water lines are properly closed. 5.3.2 Ensure all the mains of electrical connections are switched “OFF”. 5.3.3 Chec...

Procedure for raising of supplementary material requisition

1.0 OBJECTIVE To lay down a Procedure for raising of supplementary material requisition. 2.0 SCOPE Module-1,2,3,4,5 & All packing areas. 3.0 RESPONSIBILITY Production officer / Executive 4.0 ACCOUNTABILITY Manager - Production, Executive - Quality Assurance. 5.0 PROCEDURE 5.1 Raise supplementary material requisition in triplicate. 5.1.1 When excess quantity of packing materials required due to more operational rejections . 5.1.2 When the issued quantities of materials against batch manufacturing /packing work order is On- line rejected. 5.1.3 When additional materials are required to salvage the process problems as per deviation approval. Mention the remarks on above point basis to justify the requirement in SMR. 5.2 Get S.M.R. approved by manager / Executive - production and Executive / Officer - Quality Assurance, then send it to stores. 5.3 Enclose the supplementary material requisition copy to batch documents.

Computerised System Validation Part 3

To view Computerised System Validation Part 1 click here To view Computerised System Validation Part 2 click here Site/Function Activities 1. Validation Master Plans Computerised systems requiring validation should be identified as such in site/function validation master plans (VMP). Plans should be produced in association with system registers, identifying validation requirements for both new and legacy computerised systems. 2. System Register System registers, providing an inventory of computerised systems should be created and maintained for each site or company. Advice for centrally developed/supported systems can be found in the forthcomming posts. Note: Sub-systems and systems components should not be listed in the system register. Each register should contain, as a minimum, the following information for each system listed: • Name (by which the system is known and commonly referred to). • Unique reference/acronym (for traceability). • System description (phrase/sentence describin...

Computerised System Validation Part 2

To view Computerised System Validation Part 1 Click Here Responsibilities The responsibility of the personnel associated with computerised systems is to ensure that they understand the requirements of Computerised System Validation and comply with it. This guideline should be used by individual sites/departments as appropriate to prepare their own local procedures. Validation and regulatory compliance is the responsibility of each site/department and should be incorporated into their quality planning. Local user, IT, controls engineers, laboratory technicians, and QA are expected to take an active role. The senior management role is usually conducted in conjunction with QA. Emphasis between roles will vary depending on the nature of the work being conducted. 1. Senior Management Responsible for: - Providing adequate resources. - Final authorisation of the validated system for use. 2. System Owner/User Role Responsible for: - Validation activities associated with any aspect of the requi...

Computerised System Validation - Part 1

Computerised System Validation is the Big Topic and will be posted in several posts, hence the part number mentioned in the topic RATIONALE Computerised systems are increasingly being implemented to realise operational benefits within manufacturing working environments. It is essential that there are controls in place to ensure such systems are validated as fit for purpose PURPOSE To provide guidance when implementing Computerised System Validation. To provide specific additional guidance on the approach to validating different types of computerised systems SCOPE This guideline applies to all sites and companies manufacturing, distributing or marketing materials, products or devices for use or sale by, or for, XXX Pharma. This guideline applies to computerised systems that are used in support of those agency regulated manufacturing of pharmaceutical, biologic/biopharmaceutical, and healthcare products requiring computer validation. Agency regulations include but are not limited to: • A...

Receipt and storage of Finished Goods

1.0 OBJECTIVE To lay down a procedure for Receipt and Storage of Finished Goods from production. 2.0 SCOPE Finished goods ware house - Formulations Unit 3.0 RESPONSIBILITY Officer - Excise. 4.0 ACCOUNTABILITY Executive - Excise 5.0 PROCEDURE 5.1 Precautions 5.1.1 Goods produced during the day should be transferred to bond room daily. 5.1.2 All the products which are sensitive to be kept in cool storage area. 5.1.3 Ensure cool storage area temperature should be maintained below 25° . 5.1.4 Cool storage area temperature to be recorded twice a day 5.2 All the finished goods received from production to be accompanied by transfer note. 5.3 Finished goods Transfer Note to be prepared by Production officer and same is to be counter signed by Quality Assurance department after inspection of the packing. 5.4 Finished goods should be arranged upon the pallets up to a height of 3 feet and arrangement should be equal. 5.5 After receiving the stocks from p...