1.0 OBJECTIVE
To lay down a procedure for codification of sieves.
2.0 SCOPE
Module -1,2,3,4 and 5
3.0 RESPONSIBILITY
Production officer.
4.0 ACCOUNTABILITY
Production executive.
5.0 PROCEDURE
5.1 On receipt of sieves, engineering executive has to check the sieve size and integrity.
5.2 Ensure soldering at the junction of sieve and rim before issuing to the production.
5.3 Codify the sieves as per sieves inventory record and mark the code number on sieve rim in-coordination with engineering department.
5.4 Sieve codification number shall be given with 9 characters number.
Ex: 020 005 8
20 - Stands for sieve size.
005 - Stands for sieve serial number
8 - Stands for year 1998.
No comments:
Post a Comment