1.0 DISTRIBUTION
All Departments.
2.0 APPLICABLE DOCUMENTS
INM-03-001 Environment Health and Safety Policy
INM-03-002 Health and Safety Committees
INM-03-003 General Plant Safety
3.0 APPLICABLE FORMS
INM-03-024-01A EHS Project Review Check List
4.0 APPLICABILITY
This procedure applicable to Xxx India Pvt Ltd, Xxx Plant
5.0 PURPOSE
To layout procedures to link all EHS Policies and aspects.
6.0 SCOPE
This procedure provide guidelines on the EHS requirements on project work that involve the installation of new equipment or processes
7.0 RESPONSIBLE DEPARTMENTS
QA, Production and Engineering
8.0 RESPONSIBILITY
EHS Coordinator
9.0 PROCEDURE
9.1 The respective department supervisors are responsible for the preparation and maintenance of the EHS Project Review Checklist, INM-03-024-01 at the time a new machine or process is being considered.
9.2 In the checklist, the department supervisors are required to refer to the respective stated policy.
9.3 The EHS personnel will review the checklist for assessing the EHS impact of the new project.
9.4 EHS personnel will work together with the respective department supervisor and develop an EHS Project Review Plan based on the Checklists.
9.5 For the determination of significant EHS aspects, an evaluation viz flow diagram of key stages of process and Input/Outputs at each stage is to be forwarded by the owner to the EHS personnel for assessment of EHS impact & filing.